From: route@monster.com
Sent: Friday, April 08, 2016 12:11 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: p6 PMP
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Anne Marie Gignac 29 Ingleside Drive, North York Ontario M3K 1V2, 1450
Locust Ave, Long Beach CA 90813 Phone: (416) 906-2038: Email: gignacannemarie@gmail.com, https://ca.linkedin.com/in/annemariegignac KEY QUALIFICATIONS • Fifteen years of functional experience in
project management / project coordination • Strong project management skills –
Certified PMP and Scrum Master- Currently working towards Lean 6 Sigma Green
Belt. EXPERIENCE Cooper
Home Improvement
(Apr 2015 – Current) Project
Coordinator-Project Controls (Occasional work) Tile installation company in the Greater
Toronto Area · Schedule creation, Project Controls · Project Coordination when work load became heavy TES – The
Employment Solutions – ABB - Burlington- Solar Division Assistant
Project Manager (Term position) -
(Nov 2014-
Dec 2014) EPCM – PENN Solar Projects South Glengarry –
Edwardsburgh - Hamilton · Assistant to Senior Project Management for 3 Solar Site
Farms · Working on “PUNCH LIST” for “Substantial Completion” and
“Final Completion” · Verify and preparing data reports for “Force Majeure”
extreme weather conditions · Obtaining updates between Site, Office, Client, Owner and
working to close out items i.e.) find OEM paint supplier for scratched I
House, arranging
for city Permits, Verify documents were uploaded to SharePoint, contact Sub
Contractors to complete/verify remaining work/items, basically
whatever was on Punch List was addressed, other AD HOC reports/work items
etc. Utilized Word, Excel, Outlook, Power Point. Assistant PM/ Project Coordinator/
Planner/Scheduler: (Term position)
(May 2012-
May 2014)
EPC
& EPCM - Hydrocarbons and Chemicals division · Assistant to Senior Project Management/Project
Coordinator for various EPC Projects up to $20 million · Develop and Assist Development of Schedules in Primavera
P6 and MS Project, Reviewing the efficiency and effectiveness of · Service delivery. Project Coordination, Assisting PM’s,
Engineering Department Leads with Work Breakdown Structure, Manpower Loading
and variances
in Baseline Schedule on a Bi-Weekly occurrence. Uploading reports to the
SharePoint system. · Develop formulas in MS Excel for Dashboards Reporting on
Project Progress, Manpower Hrs, Earned Value, Baseline
Budget adherence, CPI, SPI, TCPI, KPI’s etc. · Month End Reporting on KPI etc for Project Controls
Department · Tracking and adjusting Budget, Dashboard reports and
schedules with Scope changes, DCN (design change notices), and PCN
(purchase change notices). ICON
Aircraft
(Jan 2012-
Apr 2012) Planner: (Contract
position)
Icon is a new amphibious aircraft. Prototype
is complete and they were ramping up for production. · Develop schedules and reports for all stages of final
design and ramp-up and develop methods for reporting and standards for
scheduling, training staff in scheduling and Project Management Principles
and Techniques. Utilizing MS Project, Share Point, Word, Excel, Outlook,
Power Point Cooper
Home Improvement - Oshawa, ON - Bakersfield CA
(Aug 2011-Dec 2012) Project
Controls Specialist :( Telecommuting - Contract position) Tile installation company in the Greater
Toronto Area · Create schedules from estimates, Train personnel on
scheduling and tracking techniques and project management techniques, design
and set up templates etc. Utilizing MS Project, Share Point, Word, Excel,
Outlook, Power Point Consult
Net - Processes Unlimited - Bakersfield, CA
(May 2011– Jun 2011) Project
Controls - Scheduler: (Term - Contract
position) EPC & EPCM - Engineering and Design for
Oil Industry-Chevron business partners · Create cost loaded and resource loaded schedules from
estimates and create baseline in MS Project 2007 Professional. · Update and reconcile schedules after weekly time sheet
updates/downloads · Hold weekly meetings with Project Managers and Area Leads
to review and update schedule timing, manpower loading, Earned Value and
update needs/ task lists. In a matrix environment · Report on Earned - Value, CPI, SPI to client
(Chevron), Utilizing MS Project, Share Point, Word, Excel, Outlook, Power
Point Principle
Technical Services - TJ Cross Engineering – Bakersfield, CA
(Jun 2008-Oct 2009) Senior
Scheduler: (Term Position) EPC & EPCM - Engineering and Design for
Oil Industry-Chevron business partners · Create and update cost and resource loaded schedules from
estimates on MS Project 2007 and MS Excel · Report on Earned Value, CPI, SPI and other metrics
directly to Client (Chevron) · Worked with Lean Management Team to achieve companies’
overall Lean efforts · Track and monitor various metrics for KPI’s, companies
overall schedule reporting metrics against dashboard · Attend internal and customer weekly review meetings with
department leads and clients in a Matrix environment · Co-developed MS Access program for ECN (Engineering Change
Notice) tracking, and document submittal, and project closeouts. · Utilizing MS Project, Share Point, Word, Excel, Outlook,
Power Point Zarko’s
Services - Windsor, ON
(Jul 2007-Jun 2008) Proposal
Specialist: Recycling of household Blue Box and Red Box
recyclables in Essex County · Prepare bid proposals, Develop scope, experience
letters, Develop costs for operations · Organize and arrange for liability insurance, fleet
insurance, workers compensation, bonding, etc. Utilizing Word, Excel,
Outlook, Power Point RSM for
Anne Marie Gignac PG. 2 Severn
Trent Services - Torrance, CA
(Jan 2007- Apr 2007) Proposals Engineering Consultant - (Consultant -
Contract position) Severn Trent Services provides water and
waste water treatment products and operating services to utilities,
municipalities and commercial customers ·
Responsible
for timing of programs and proposals ·
Responsible
for review of technical specifications and standards and proposal
requirements · Assisted with proposal and pricing strategies with review
from finance utilizing BaaN, Word, Excel, Outlook, Power Point Meda
Engineering, International Trucks, Center for Innovation – Windsor, ON (Feb
2005- Dec 2006) Prototype Build Support: (Term
position) Manufacturers of Semi Trucks and Heavy Duty
Trucks ·
Coordinate
purchase contracts and engineering status for upcoming builds and maintain
the BaaN mainframe system ·
Expedite
prototype metal stamping materials and plastic injection molding parts as
required for prototype builds. utilizing BaaN, Word, Excel, Outlook, Power
Point SIB
Store Interiors – Windsor, ON
(Jan 2004-Jan 2005) Design Set Up: (Term position) Store Interior Designers · Followed blueprints and coordinated the set up interior of
the Designer Depot and Zellers Stores. Jim
Kramer Company/Quigley Industries – Rochester Hills, MI
(Oct 1995-Nov 2003) Program Manager/ Cost
Engineer:
(Feb 1994-Apr 1994) Subsidiary to Quigley Industries- Light
metal stampings, Headrest Assemblies, Tubing, Dipstick for G.M., Lear
Corporation, Detroit Diesel, Volkswagen. · Overall project management for projects i.e.) estimating,
prototype, tooling, sign off etc. Utilizing MS Project, Share Point, Word,
Excel, Outlook, Power Point, Access Lear
Corporation-Ford Division – Allen Park, MI
(May 1994-Aug 1995) VA/VE – Value Analysis/ Value Engineering Analyst: Tier 1 Seating to Ford ·
Participate
in Ford sponsored VA/VE Blitz Program (Re-engineering seating programs).
Leading and co-coordinating and reporting VA/VE activities to Ford.
Coordination and tracking changes and proposals to implementation, Word,
Excel, Fox Pro Lakeside Plastics – Windsor, ON
(Jun 1993-Jan 1994) MIS (Management Information System) Manufacturing Consultant - (Term position) Plastic Injection Molding: Tier 1 supplier
to G.M ·
Set
up the manufacturing system on the AS 400 database system, linking
manufacturing processes, developing work stations for machines, cycle times
for parts, BOM routing to accounting, shipping and receiving, and inventory
control and user screen authorization through the AS 400. Integram
Seating (Magna Corporation) – Windsor, ON
(Dec 1992-May 1993) Cost
Accounting Clerk - (Term position) Seating- Tier 1 to Chrysler ·
Working
through the computer system input and reporting on accounts receivable and
payable. Initialized the NAFTA agreement within the company Knapp
Plastics – Leamington, ON
(Jun 1990-Dec 1992) Industrial / Project Engineer Plastic injection mold and paint: Tier 1
supplier to Volkswagen and G.M. Project Engineer: 1990 - 1992 ·
Manage
and develop projects and customer proposals. Obtained outside bidding
packages for tooling and secondary operations ·
Analyzing
all incoming RFQ’s and preparing estimates and proposal, and Project
Scheduling Industrial Engineer: 1990 - 1990 ·
Developed
process sheets, procedures and display boards, packaging studies, bills of
material and developed work station layout A.G.
Simpson – Windsor, ON
(Jan 1990-Jun 1990) Statistical Consultant - (Term position
while in college) Tier 1 supplier of Heavy Metal Stampings · Performed Taguchi design of experiments (D.O.E.) while in
college. PMI –
Project Management Institute - Southwestern Ontario Chapter – Volunteer Instructor-
PMP Certification Exam Preparation
Course
(Nov 2013– Nov 2013) · Instructed participants in the Costing Module of the PMI
courseware including Costing and Earned Value in preparation for the PMP-
Professional Project Management Certification held at Lambton College. EDUCATION: St. Clair
College, Windsor, ON · Industrial
Engineering:
1990 Honors Received: Deans Award (Highest in Class), Honor Roll, Canada Packers Award
Program Coordinator for the SME, Al Phlanzer Award Certifications: · Certified PMP-Professional Project Manager: through the PMI Institute #1331747
since
26-Apr-2010
2010 · Certified Manufacturing Engineering
Technologist- CMfgET Society of
Manufacturing Engineers (SME) – Expire
1990 · Certified Scrum Master CSM - through Scrum
Alliance #128507 Since
13-Mar-2011
2011 · Certified Six Sigma Green Belt: through 6 Sigma Study #67605 since
09-Sep-2015
2015 |
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
|